Updated May 24 2023 This post at Brown County Matters
Preliminary Engineering Reports (PER). Identifies the information required to receive funding.
Brown County Wastewater Strategic Plan and Watershed Study – the “foundation” for the PERs. Includes video presentations of the plan and study, respectively. The Helmsburg PERs also available at the HRSD Facebook Page
-
- The Watershed Study is in Appendix B
The Brown County Regional Sewer District (BCRSD) collects the wastewater. The Helmsburg RSD will expand its wastewater treatment plant to accommodate Phase 1 customers. The HRSD will have a second PER as a backup plan to make the needed repairs and upgrades to serve their current customer base if one or more sections of the Phase I project are not funded.
Phase I of expanding sewers includes a western corridor (Helmsburg to Lake Lemon and an Eastern Corridor – Helmsburg to Bean Blossom and Woodland Lake.
BCRSD PER
Complete Report – 315 pages 2023.3.31 Initial Submittal – Brown County RSD Preliminary Engineering Report
Report by Sections:
2023.3.31 Initial Submittal – Brown County RSD Preliminary Engineering Report
-
- APX A Study Area Maps
- APX B Project Need Documentation plus Letters of Support (over 140 – ALL from Lake Lemon property owners)
- APX C Phase I Collection System Cost Estimates
- APX D WWTO Alternative Cost Estimates and APX E Soils Map
- APX F Interim Report and Historic Sites
- APX G Wetland Map
- APX H Hydrology and Floodplain Maps
- APX I Prime Farmland Determination p250
- APX J Draft Financial Report and Capital Improvement Plan and Rate Structure
- APX K Acceptance Resolution p294
- APX L Signatory Authorization –p296-297
- APC M SRF Project Financing Form p298
- APX N Public Participation p302
- APX O Clean Water Checklist p303
- APX P Preliminary Design Summary p310
- Additional Documentation
PER – Helmsburg RSD WWTP Expansion
PER – HRSD WWTP Replacement 2023_03_31